Assistance / Site Activities Services

As a technical services company with its team of certified professionals, we are Engineers, Petroleum Engineers, Asset Managers, Project Managers, Operations Managers, certified industry Training Instructors and Field Technicians. We provide technical consulting, capacity development, and project management services in field development planning with expertise from Welding to asset management (production enhancement & operations management) in the industry.

Details Services

Welding Activities

is the processes and tasks involved in joining metal components to construct, maintain, and repair infrastructure such as pipelines, rigs, refineries, and storage tanks. These activities are critical for ensuring the safety, integrity, and efficiency of oil and gas operations. Techniques commonly used include Manual Metal Arc Welding (MMA), Gas Tungsten Arc Welding (GTAW), Gas Metal Arc Welding (GMAW), and Submerged Arc Welding (SAW)

Mechanical Completion

is the phase in a project's lifecycle where all mechanical, electrical, and instrumentation installations are completed in accordance with the project's design specifications, standards, and regulatory requirements. This phase ensures that the constructed facilities or systems are ready for pre-commissioning and commissioning activities. Mechanical Completion involves: Verification, Testing, Inspection, Documentation, Punch Listing

Pre-Commissioning

refers to the set of activities carried out after mechanical completion and before the commissioning phase. It involves a series of checks, tests, and procedures to ensure that all systems and equipment are ready for safe and efficient operation. The goal is to confirm that installations are completed according to design specifications and are functioning properly before full commissioning and startup. Pre-commissioning includes: Cleaning,Testing,Calibration,System Checks, Documentation, Punch List Clearance

Commissioning

refers to the phase following pre-commissioning, where systems and equipment are tested and started up to verify that they operate as intended in a fully integrated manner. The goal is to ensure that the plant or facility is ready for safe and efficient production. Commissioning involves:Initial Startup, Performance Testing, Operational Verification, Training, Documentation

Preparation of ITR’A

involves creating detailed documentation that records the inspection and testing activities carried out during various project phases. These records are essential for verifying that equipment and systems meet specified standards and regulatory requirements. Preparation of ITRs includes:Document Development,Specification Compliance,Data Collection,Verification and Validation,Approval Process,Record Keeping.

Preparation of ITR’B

The preparation of ITRs 'B' ensures that all critical inspections and tests are thoroughly documented and validated, providing a robust record of compliance with stringent quality and safety standards for the most essential and complex components of the project.usually for more complex or critical systems and equipment compared to ITRs'A' , The preparation of ITRs 'B' includes:Template Development, Compliance Requirements, Detailed Data Collection, Thorough Verification, Review and Approval, Documentation and Archiving

Start-up

Start-up in the oil and gas industry refers to the phase following commissioning where the newly installed systems and equipment are brought into active operation. This phase involves initiating the production processes and ensuring that the facility operates as intended under real conditions. Start-up includes:System Initialization, Operational Testing, Performance Monitoring, Troubleshooting, Optimization, Training and Handover.

Punch Items Management

refers to the systematic identification, documentation, tracking, and resolution of outstanding issues or defects (known as punch items or punch list items) that are identified during various phases of a project, typically during mechanical completion, pre-commissioning, and commissioning. These items must be addressed before the project can be considered fully complete. Punch Items Management includes: Identification, Documentation, Categorization, Assignment, Tracking, Resolution, Verification, Documentation Closure

Final Dossier Preparation

refers to the comprehensive process of compiling and organizing all essential documentation and records related to a project, ensuring that everything is in order before project handover or regulatory review. This dossier serves as the definitive reference for the project's completion and compliance with standards and specifications. Final Dossier Preparation includes:Document Collection, Verification, Organization,Indexing,Quality Assurance, Approval ,Compilation, Submission, Archiving